Week 9 Production Log (DeadLine week)
This week was are deadline week for our music video, so this mean that it had to be fully filmed and edited by Tuesday 18th of March. So on that Tuesday we stayed in school until 6:00pm to get our music video completed. Once it was fully edited we showed are teachers and he told use to change a few things, when once that was done, we had to upload are final music video onto YouTube . On Wednesday the 19th we started our evaluation for the music video.
How does this fit in with the production schedule/job roles/overall ideas of the project?
We fitting into out production schedule by completing our music video on the day given and did not need extra time to do so. Also we stuck to our job roles, due to the fact that I was doing most of the editing as Jasmeet told me what she wanted in the music video as the director.
Were there any problems?
This week we faced little or even no problems. Everything went fine and we got our music video competed to a standard that we were happy with and felt that it will get us top marks.
How did you/will you overcome them?
Because we had no problems we did not have to overcome anything.
What are the plans for the following week?
For the following week I am planning on carrying on with my music video evaluation, hoping I can complete by the end of next week, so that I have time to edit any other coursework that is not up to the best possible grade.
Week 8 Production Week
What have you contributed this week?
This week Jasmeet and I have been carrying on with editing our music video. We had edited our final couple of shots, and making sure the begins is perfect.
How does this fit in with the production schedule/job roles/overall ideas of the project?
We are currently on track according to out production schedule and, are job roles have really been used to our advantage. I as the main editor have done most of the editing, but as Jasmeet as the main director she has told me many things to change and to add in.
Were there any problems?
There were no problems this week. We new what we had to do, so we just got on with it. We just had to think of different transition from shot to shot.
How did you/will you overcome them?
We spend time looking at the different transition, and thinking which one will best suit our music video
What are the plans for the following week?
Next week we are going to carry on editing and, get our music video completed, because next week is dead line day.
This week Jasmeet and I have been carrying on with editing our music video. We had edited our final couple of shots, and making sure the begins is perfect.
How does this fit in with the production schedule/job roles/overall ideas of the project?
We are currently on track according to out production schedule and, are job roles have really been used to our advantage. I as the main editor have done most of the editing, but as Jasmeet as the main director she has told me many things to change and to add in.
Were there any problems?
There were no problems this week. We new what we had to do, so we just got on with it. We just had to think of different transition from shot to shot.
How did you/will you overcome them?
We spend time looking at the different transition, and thinking which one will best suit our music video
What are the plans for the following week?
Next week we are going to carry on editing and, get our music video completed, because next week is dead line day.
Week 7 Production Log
What have you contributed to this week?
This week me and Jasmeet continued on with our diting. We had managed to get the intro, first verse and chorus edited and finalised. We had realised how difficult it would be to put together shots in a totally new programme to us and found ourselves looking at a lot of YouTube tutorials to help us with editing. We also did some extra filming of the shots that we needed to do in school were I had to film Jasmeet in shots of her walking into the school receptions which is meant to be the hotel. We then uploaded this onto final cut express.

How does this fit in with the production schedule/job roles/overall ideas for the project?
This week me and Jasmeet continued on with our diting. We had managed to get the intro, first verse and chorus edited and finalised. We had realised how difficult it would be to put together shots in a totally new programme to us and found ourselves looking at a lot of YouTube tutorials to help us with editing. We also did some extra filming of the shots that we needed to do in school were I had to film Jasmeet in shots of her walking into the school receptions which is meant to be the hotel. We then uploaded this onto final cut express.

How does this fit in with the production schedule/job roles/overall ideas for the project?
I am pleased to say that we are on track and on target. We are at a good place at this moment during the task and are not falling behind. Although we have gone through some problems due to the our cast not being able to turn up when we needed them,but we are still on target and are very happy with our upcoming shots. The job roles have been split between both myself and Jasmeet and we have really worked together and helped each other in each task.
Were there any problems?
There was the issue of the introduction of our piece. In previous weeks we had wanted there to be a beginning introduction before the song begins. The reason for this would be because we wanted to give the audience the foundations of the music video so that the audience understand the rest of the song much more. We thought we had enough footage for this beginning sequence but when it came to the editing of the music video, we both had noticed that it wasn't flowing nicely and looked way to jumpy and the lighting in some of the shots was very bad. We wanted to change this as it wasn't a good start to the music video and it gives a bad idea to the audience to what the rest of it may look like.
How did you/will you overcome them?
To overcome these problems we decided to get ride of the opening of our music video, this then gave us time to focus more on the actually song so that it looks at good as it can.
What are the plans for the following week?
We are going to shoot some extra footage on the chorus to change up the shots and add more close ups. We will also continue the editing process and work toward fridays deadline.
Were there any problems?
There was the issue of the introduction of our piece. In previous weeks we had wanted there to be a beginning introduction before the song begins. The reason for this would be because we wanted to give the audience the foundations of the music video so that the audience understand the rest of the song much more. We thought we had enough footage for this beginning sequence but when it came to the editing of the music video, we both had noticed that it wasn't flowing nicely and looked way to jumpy and the lighting in some of the shots was very bad. We wanted to change this as it wasn't a good start to the music video and it gives a bad idea to the audience to what the rest of it may look like.
How did you/will you overcome them?
To overcome these problems we decided to get ride of the opening of our music video, this then gave us time to focus more on the actually song so that it looks at good as it can.
What are the plans for the following week?
We are going to shoot some extra footage on the chorus to change up the shots and add more close ups. We will also continue the editing process and work toward fridays deadline.
Week 6 Production Log
What have you
contributed to this week?
How does this fit with the production
schedule/job roles/overall ideas for the project?
We are currently sticking to our
production schedule, and are not falling being on filing or editing. We stuck
to our job role because I was the main person to edit the music, with Jasmeet
as the director telling me what she liked and how she wanted certain shot to
looks. We were lucky that we are on the same wave length because the ideas that
we both put across was liked by the other person, so we did not have to try and
find a compromise when editing. We had also experimented with a lot of tools in
this programme such as the Cross-Dissolve and Fades.
Were there any problems?
When we looked at the footage we
noticed that some shots had lighting issues, we tried to lighten them up on
final cut express, be the shot looked very unreal and fake. We when decided
that we had to re film them shots in order to get the lighting on point. Also
when looking through the footage we noticed that we did not film some shots and
some shots we did film needed were not sung with a lot of passion by jasmine.
So we had to go back to the school studio to re-film them. How did you/will you overcome them?
To solve this problem we had to re shoot which was not a problem because we were on schedule and were able to fit in a time to do the footage, which made use not fall behind. We are glad we did as it looks much better than it did before. We made sure that the lighting was much brighter naturally which enabled the camera to pick up on facial expressions of each actor much more better.
What are the plans for the following week?
The following week will consist of re shooting the darker shots and school studio shots. We will also be continuing on with the editing to get closer to finishing out music video
Week 5 Production Log (Half Term)
What have you contributed this week?
In this week we, it was half term and we wanted to get most of our filming done. Before this week me and Jasmeet sat down and discussed what we wanted todo in half term and the days and times we wanted to film on. We could not film on saturdays and any day after 6 due to he fact that me and Jasmeet both have part time jobs, but we both managed to find days that we could do. But the shots we got done were
Hoe does this fit into your production schedule/job role and overall idea of the project?
In our production schedule, we set dayS to get most of our filing done in the hotel rooms, but due to out location not letting us film there we had to cancel the days we was going to film come up with a new location. So in the half term we could not stick to production schedules or job roles, due to the fact that we did not film or edit in half term.
Were There Any Problems?
In this week we faced a lot of problems. Are location did not let us film, so we had to use are quick thinking and come up with a new location very quickly. We came to the choose that we would film at my house and use my house at a hotel room. Also in
In this week we, it was half term and we wanted to get most of our filming done. Before this week me and Jasmeet sat down and discussed what we wanted todo in half term and the days and times we wanted to film on. We could not film on saturdays and any day after 6 due to he fact that me and Jasmeet both have part time jobs, but we both managed to find days that we could do. But the shots we got done were
Hoe does this fit into your production schedule/job role and overall idea of the project?
In our production schedule, we set dayS to get most of our filing done in the hotel rooms, but due to out location not letting us film there we had to cancel the days we was going to film come up with a new location. So in the half term we could not stick to production schedules or job roles, due to the fact that we did not film or edit in half term.
Were There Any Problems?
In this week we faced a lot of problems. Are location did not let us film, so we had to use are quick thinking and come up with a new location very quickly. We came to the choose that we would film at my house and use my house at a hotel room. Also in
Wednesday, 19 February 2014
Week 4 Production Log
What have you contributed this week?
This week we had finished all the paperwork needed for shooting, and it was all uploaded on our blogs. With the paperwork completed we starting filing on Thursday 12th February we had begun shooting our chorus for our song. We used the schools studio room after school. We were in school till about 6 o'clock and achieve all the footage for the chorus. We then in are next lesson uploaded the footage straight onto Final Cut Express. We wanted to upload as we filmed along so the ideas are still fresh in our minds. It will also make it easier as we will try to edit as we go along as best as we can.This will speed the process up when it comes to the editing so there will be no rushing towards the final deadline. Also I went to my uncles house and filmed the POV shots from Jasmines perspective as she walks down the hotel lobby.
How does this fit in with the production schedule/job roles/overall ideas of the project?
We wanted to start filming on the Wednesday but couldn't because although our paperwork was done it was not uploaded on our blogs. This pulled us back in the schedule we wanted to stick by. However we had pulled through on the Thursday and did the whole chorus which was a good achievement for us due to the fact that we had missed a day of filming. The ideas are still sticking to plan and we haven't strayed away from our shooting script which is good. What we did this week outlined are job roles a lot more, because I am main camera man and editor it showed this week, because I went a filmed the shots in my uncles house by my self.
Were there any problems?
The only problem we faced was the fact that we could not film on that Wednesday, due to the fact that we did not have all of are paperwork uploaded onto are blogs.
How did you/will you overcome them?
We overcame this problem by shooting on the next day and made sure we completed all the shots in this specific location. We wanted all the studio shots to be done all at once because we didn't know when the studio will be next available. Also throughout the half term there will be no access to the studio.
What are the plans for the following week?
The following week is half term which is where the majority of our shooting will be done. We aim to get all the the footage completed by the end of next week ready for the new term to edit and complete the music video. Also to re-film any shots that we are not happy with
This week we had finished all the paperwork needed for shooting, and it was all uploaded on our blogs. With the paperwork completed we starting filing on Thursday 12th February we had begun shooting our chorus for our song. We used the schools studio room after school. We were in school till about 6 o'clock and achieve all the footage for the chorus. We then in are next lesson uploaded the footage straight onto Final Cut Express. We wanted to upload as we filmed along so the ideas are still fresh in our minds. It will also make it easier as we will try to edit as we go along as best as we can.This will speed the process up when it comes to the editing so there will be no rushing towards the final deadline. Also I went to my uncles house and filmed the POV shots from Jasmines perspective as she walks down the hotel lobby.
How does this fit in with the production schedule/job roles/overall ideas of the project?
We wanted to start filming on the Wednesday but couldn't because although our paperwork was done it was not uploaded on our blogs. This pulled us back in the schedule we wanted to stick by. However we had pulled through on the Thursday and did the whole chorus which was a good achievement for us due to the fact that we had missed a day of filming. The ideas are still sticking to plan and we haven't strayed away from our shooting script which is good. What we did this week outlined are job roles a lot more, because I am main camera man and editor it showed this week, because I went a filmed the shots in my uncles house by my self.
Were there any problems?
The only problem we faced was the fact that we could not film on that Wednesday, due to the fact that we did not have all of are paperwork uploaded onto are blogs.
How did you/will you overcome them?
We overcame this problem by shooting on the next day and made sure we completed all the shots in this specific location. We wanted all the studio shots to be done all at once because we didn't know when the studio will be next available. Also throughout the half term there will be no access to the studio.
What are the plans for the following week?
The following week is half term which is where the majority of our shooting will be done. We aim to get all the the footage completed by the end of next week ready for the new term to edit and complete the music video. Also to re-film any shots that we are not happy with
Wednesday, 12 February 2014
Permission To Film
In this piece of paper work we have to show proof that we are allowed to in the location that we have chosen.
Jasmine's room (My sisters room) / Hotel room (My mum and dads room) / Hall way My hall way in house) / living room (My living room in his house)
All of these locations are in my house. So because it is my family property we did not need permission to film here, because I live there are my family would not mind me filing in the house to produce a project for my final grade.




Hotel lobby(My uncles house)
The location we have chosen to film are hotel lobby scene in is my uncles house. Because it is my uncles house we did not need formal permission to film there. But i have asked him if it is ok out of good will and he said "Yes that is ok, take as long as you like"

Street (Ashburton Avenue)
The street we are using to filing some of are scene at is a street near to were I lives. This is a public place so we did not need any formal permission to film there.
School Studio
We are filing in the school studio to film are chorus in there. It is not a public place so we have to get permission from there teacher that is in charge of the school studio. This is Mr D, we found him after school on day and explained to him that we are filing a music video and need the school studio afters school on the 12-2-14. He said "Yeah that is fine, you can use it"
Hotel lift (School lift)
We are using the school lift to act as a hotel lift. The lifts in school are normally locked and the keys are normally held by the corridor ladies. So at lunch I asked miss Miss knight is we could have asses to one of the lifts in the school and she said "Ok yeah that is fine just remind to on the day you want the key and i will open it for you, no problem"
Tuesday, 11 February 2014
Job Roles and Responsibilities
In this Project their are the two main job roles and these are
Me and my partner both disused with each other and we both don't want to put full responsibility on each other to just do one particular job role. This is because we both felt as we both need to have input in each role in order to get the best possible grade in are music video. But if we had to give someone are more important job, we would make myself the main camera operator and editor, this is because I have had past media experience, so I understand how the cameras and editing software works just that little bit better than Jasmeet. And Jasmeet will take up the role of main director and production manager. This is because she is currently doing A2 drama, and has the experience in sorting out any problems in a group, and thing of ways to solve them. Also she has better management skills that I do, so she will be able to manage our time better, in term of filing and editing. But these role are just role that we both fell we can see the best in. These are not role that we just have to stick to. obviously Jasmeet will being doing part that my job involves such as filing certain shots and editing part in the music video, and I will be also looking at are time scale and seeing if we are going to meet the deadlines, and also I will be putting in ideas that might change the music video a bit. But overall we both will play a equal part in both roles, and will work together effectively, to produce and amazing final music video.
Monday, 10 February 2014
Sunday, 9 February 2014
Friday, 7 February 2014
Thursday, 6 February 2014
Week 3 Production Log
What have you contributed this week?
In this me and Jasmeet finally finished out shooting script, we ended up on 122 but this was after we showed are teacher. Before this we had 109 shots. Once we were happy in what we did, we showed our teacher, to see what he thought of it, and he told us what we could improve. We when went back to the computers and made these changers. After this I linked our shooting script, onto blogger. We also started with are production schedules, which was a plan on what shot we are going to film on each day. We also started with all of are paper work. This included are Risk assessment, which is now finished, also I printed of are waiver for our cast, which are cast need to fill out to show provides proof that they what to be part of our music video, they still need to sign this form. Also I printed of our call sheets which needs to be filled in each day we film.
How does this fit in with the production schedule/job roles/overall ideas of the project?
This week we just finished making our production schedule, so we did not need to follow a production log for this week. But we are up to date with all the work and have not falling behind on our class deadlines. This week me and Jasmeet sat down and discussed what are job roles will be. We decided that I will be main camera man and editor, due to have more experience that Jasmeet in both areas. Jasmeet will be the main director, due to the actually song be her original song, and she has a clearer and better image of what she wants the music video to look like than I do.
Were there any problems?
This week the only problem we faced what the fact that, after showing our teach out final shooting script, he made us make some changes to it, such as keep the chorus parts of the song either as performance or narrative and not switch from one to another, which we had now done. Also our teacher made us make minor changed to some of our shot types and angles, in order for it to make more sense to the audience. Also another problem we faced was the fact that we still did not know 100% where we were going to film our hotel scenes.
How did you/will you overcome them?
We over came our teachers feed back by making the changes to our shooting scripts, so it fitted in to what our teachers would prefer. And with regards to the hotel situation, we have tried to ring the hotel but we have had no answer. We are still ringing them and if they still don't answer, our teacher said he might be able to use his flat, which looks like a hotel, if the school allow the teacher to had students in his house. If the school say no we will have to go to our last option which is making the school reception our hotel reception, and my mum and dads room the hotel room.
What are the plans for the following week?
Next week we hope to get all of our paper work done, and then on the 11th/12th/13th we hope to start filming and get all of our chores shot done.
In this me and Jasmeet finally finished out shooting script, we ended up on 122 but this was after we showed are teacher. Before this we had 109 shots. Once we were happy in what we did, we showed our teacher, to see what he thought of it, and he told us what we could improve. We when went back to the computers and made these changers. After this I linked our shooting script, onto blogger. We also started with are production schedules, which was a plan on what shot we are going to film on each day. We also started with all of are paper work. This included are Risk assessment, which is now finished, also I printed of are waiver for our cast, which are cast need to fill out to show provides proof that they what to be part of our music video, they still need to sign this form. Also I printed of our call sheets which needs to be filled in each day we film.
How does this fit in with the production schedule/job roles/overall ideas of the project?
This week we just finished making our production schedule, so we did not need to follow a production log for this week. But we are up to date with all the work and have not falling behind on our class deadlines. This week me and Jasmeet sat down and discussed what are job roles will be. We decided that I will be main camera man and editor, due to have more experience that Jasmeet in both areas. Jasmeet will be the main director, due to the actually song be her original song, and she has a clearer and better image of what she wants the music video to look like than I do.
Were there any problems?
This week the only problem we faced what the fact that, after showing our teach out final shooting script, he made us make some changes to it, such as keep the chorus parts of the song either as performance or narrative and not switch from one to another, which we had now done. Also our teacher made us make minor changed to some of our shot types and angles, in order for it to make more sense to the audience. Also another problem we faced was the fact that we still did not know 100% where we were going to film our hotel scenes.
How did you/will you overcome them?
We over came our teachers feed back by making the changes to our shooting scripts, so it fitted in to what our teachers would prefer. And with regards to the hotel situation, we have tried to ring the hotel but we have had no answer. We are still ringing them and if they still don't answer, our teacher said he might be able to use his flat, which looks like a hotel, if the school allow the teacher to had students in his house. If the school say no we will have to go to our last option which is making the school reception our hotel reception, and my mum and dads room the hotel room.
What are the plans for the following week?
Next week we hope to get all of our paper work done, and then on the 11th/12th/13th we hope to start filming and get all of our chores shot done.
Sunday, 2 February 2014
Week 2 Production Log
What have you contributed this week?
In this week we carried on with are shooting scripts. We had to think a head and know how we want are music video to look like, in terms on shot type/angle, and locations and how long we want the shot for. This is a very long and hard task which is they we only focused on the shooting script this whole week and nothing else. At the end of this week we have managed to do 75 shots, and still go left a whole chores and an outro.
How does this fit in with the production schedule/job roles/overall ideas of the project?
We have not yet made a production schedule due to the fact that we have been to focused on are shooting scripted. But we are not falling behind on any tasks and are where we want to be. As last week we have still not given roles to each other, but it still looks like I will be doing most of the filming, due to having more experience and also Jasmeet will be in some shots as well, so it makes sense if I do most of the filming. In term of overall ideas of the project, we are looking to start filming at my house on the 9th of Feb but this is not for certain. We also have a very clean overall project idea, and know how we want are music video to end up looking like, so we are focused on achieving that.
Were there any problems?
This week we did not have any major problems, because we are still just doing the shooting script. But one little problem we faced was that we where doing to have less than 100 shots by the end of the music video. This is a problem because a music video should have over 1000 shots in it, and because we where going to have less it could have effected are grade.
How did you/will you overcome them?
We over came the fact that we had few shots, by adding in an outro and the end of are music video. This will allow us to get another 15-20 shots, in are music video, which will make are number of shots get above 100.
What are the plans for the following week?
Next week we are hope to finish of are shooting script and making a proper shooting schedule, which tells us what we are going to film and each day.
In this week we carried on with are shooting scripts. We had to think a head and know how we want are music video to look like, in terms on shot type/angle, and locations and how long we want the shot for. This is a very long and hard task which is they we only focused on the shooting script this whole week and nothing else. At the end of this week we have managed to do 75 shots, and still go left a whole chores and an outro.
How does this fit in with the production schedule/job roles/overall ideas of the project?
We have not yet made a production schedule due to the fact that we have been to focused on are shooting scripted. But we are not falling behind on any tasks and are where we want to be. As last week we have still not given roles to each other, but it still looks like I will be doing most of the filming, due to having more experience and also Jasmeet will be in some shots as well, so it makes sense if I do most of the filming. In term of overall ideas of the project, we are looking to start filming at my house on the 9th of Feb but this is not for certain. We also have a very clean overall project idea, and know how we want are music video to end up looking like, so we are focused on achieving that.
Were there any problems?
This week we did not have any major problems, because we are still just doing the shooting script. But one little problem we faced was that we where doing to have less than 100 shots by the end of the music video. This is a problem because a music video should have over 1000 shots in it, and because we where going to have less it could have effected are grade.
How did you/will you overcome them?
We over came the fact that we had few shots, by adding in an outro and the end of are music video. This will allow us to get another 15-20 shots, in are music video, which will make are number of shots get above 100.
What are the plans for the following week?
Next week we are hope to finish of are shooting script and making a proper shooting schedule, which tells us what we are going to film and each day.
Sunday, 26 January 2014
Week 1 Production Log
What have you contributed this week?
In this week we had to present are music video presentations to the class which we had been planning for a few week before. I did not find this hard because I am not shy of public speaking, but getting my actually idea across was a bit hard, but I made a slideshow very clear show the audience could understand my idea better. we also did a feedback video which along with the presentation we had to go onto are blogs, which I have already posted.
After this we had to get into groups of two. This did not take very long for me and my partner because we both came to a decision together and just said we are working together. So once we where in groups we have to make a group rational video. This is a video about me and my partner and how we came about choosing a music video to stick to. This was harder than we expected, because it felt very wired talking to each other in front of the camera without anyone else in the room. We had to re shoot this about 4 times because he kept on stopping and laughing. But we over came this by already knowing what we were going to say on some questions.
We also then had to start of a brief plan for out music video. This was a plan on what we wanted to happen in each chorus and verse. We did not get a lot done on the first day on planning because we was thinking of lots of ideas we could put in are music video and kind of went of track.

Break up of music video verse.
How does this fit in with the production schedule/job roles/overall ideas of the project?
we have not yet made a production schedule, because we have not yet started to film, but we are not behind on any work, and we are right where we should be. We have not yet given each other a clear job role because we have not started to film yet, but due to past experience I would mostly taken the role as main camera man. For are overall ideas of the project we are both certain for the location and actors in we want to be in are music video.
Were there any problems?
This week we did not have any problems due to the fact that what we had to do was very clear, and we both get along very well together.
How did you/will you overcome them?
Because there was not problems in week 1 we did not have to overcome any thing. But if there was we would probably just sit down and talk about them and find ways to overcome them.
What are the plans for the following week?
Next week we are going to start are pre-planning and carry on working on are shooting scripts. By the end of next we hope to be close to finishing are shooting scripts
In this week we had to present are music video presentations to the class which we had been planning for a few week before. I did not find this hard because I am not shy of public speaking, but getting my actually idea across was a bit hard, but I made a slideshow very clear show the audience could understand my idea better. we also did a feedback video which along with the presentation we had to go onto are blogs, which I have already posted.
After this we had to get into groups of two. This did not take very long for me and my partner because we both came to a decision together and just said we are working together. So once we where in groups we have to make a group rational video. This is a video about me and my partner and how we came about choosing a music video to stick to. This was harder than we expected, because it felt very wired talking to each other in front of the camera without anyone else in the room. We had to re shoot this about 4 times because he kept on stopping and laughing. But we over came this by already knowing what we were going to say on some questions.
We also then had to start of a brief plan for out music video. This was a plan on what we wanted to happen in each chorus and verse. We did not get a lot done on the first day on planning because we was thinking of lots of ideas we could put in are music video and kind of went of track.
Break up of music video verse.
How does this fit in with the production schedule/job roles/overall ideas of the project?
we have not yet made a production schedule, because we have not yet started to film, but we are not behind on any work, and we are right where we should be. We have not yet given each other a clear job role because we have not started to film yet, but due to past experience I would mostly taken the role as main camera man. For are overall ideas of the project we are both certain for the location and actors in we want to be in are music video.
Were there any problems?
This week we did not have any problems due to the fact that what we had to do was very clear, and we both get along very well together.
How did you/will you overcome them?
Because there was not problems in week 1 we did not have to overcome any thing. But if there was we would probably just sit down and talk about them and find ways to overcome them.
What are the plans for the following week?
Next week we are going to start are pre-planning and carry on working on are shooting scripts. By the end of next we hope to be close to finishing are shooting scripts